200Kw Load Bank 0.5 Grade Orange With High Load Power Phase Voltage 400V
Product Description
The system can accurately test the output power and load capacity of various generator sets.The system consists of two parts of measurement and loading, including AC load bank, data acquisition system, automatic load and drop control system, cooling device, auxiliary control,PC software,and so on.The user can freely select local control or software control to operate the load bank.
Technical Parameters
Rating Voltage/Frequency | 200Kw at 400VAC, 3 phase 4 wire, 50 Hz, |
Max Load Power | Resistive load:200kW |
Load Steps | 1kW,2kW,2kW,5kW,10kW,20kW,20kW,50kW, 100kW,min load step: 1 kW |
PF(Power Factor) | 1 |
Load Accuracy (each step) | ±5% |
Load Accuracy (overall) | 3% |
Display Precision | 0.5 grade |
Control Power | 220VAC, 1 phase 50 Hz, |
Wire Connection | Load power supply input——busbar Control power supply input——three pin socket |
Insulation | F |
Way of Working | Continuous Work |
Cooling | Fan forced cooling, horizontal inlet air and vertical outlet cooling |
Casing Color | Grey(RAL7035) |
Dimensions | 1450 mm*900mm*870mm(length*wide*high) |
Weight | About 750kgs |
Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Contactor | Schneider |
Fuse | DELIXI |
Alloy Resistance | (self-developed) |
Product Advantage
Kaixiang company is in leading position in generator set testing and maintenance industry, besides general functions, its load bank has following unique advantages:
Standard Testing Function: The load bank can do stable test, transient test, and realize functions, such as setting, fluctuation, instant load, and instant unload.
Application
Motor manufacturing: The load bank is an ideal test equipment for generator power ,the frequency,the voltage,the current,power factor and other generator parameters.Most of the generator use the diesel oil,which can cause the fuel oil unfilled,carbon deposition ,complete machine efficiency reduced when the diesel oil load is lower than 50% or in idling situation for a long time and even cause starting difficulty ,power insuffciency,oil consumption increased,finally,opening the cylinder for maintenance too early and the abandonment ,so the load bank will be generator's ideal false load