
Add to Cart
Speed Characteristic Test Three Phase 50KW Load Bank For Generator
Product Description
It offers the most robust, high-capacity designs in the industry. It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs. It is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 50kW |
Installed Capacity | Resistive load: 50kW |
Load Step | 1,2,2,5,10,10,20kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 220VAC/50Hz, single phase |
Wire Connection | Load power supply input——terminal block |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 570*530*710mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 75kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
1.Real-time Monitor: through software display main parameter value, such as voltage, current, power, power factor, frequency and time.
2.Data Collection Interval: the minimum steady-state data resolving time is 1 second, and the minimum transient data resolving time is 40μs.
3.Stable Data Comparisons: the max value and min value of all the parameters in steady-state test are listed in software interface; it is convenient for user to compare.
4. Data Save and Query: all test data are saved in the software, and according to generator set number easy to fast query in the history test data.
Application
Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units. When the generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.