
Add to Cart
Portable Used AC Load Banks 1000KW With Copper Conductor For Power Plant
Product Description
1. our load bank an accurately test output power and load capacity with all kinds of generators.
2. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software.
3. User can control load bank through local control panel, also through software
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 1000kW |
Installed Capacity | Resistive load: 1000kW |
Load Step | 1,2,2,5,10,20,20,50,100,200,200,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 1200kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
Control mode interlock: there is switch in control panel to choose control mode, other control mode is invalid if user choose one control mode.
With data processing software, could form curve of current, active power, reactive power, apparent power, power factor, frequency and can be printed.
One-key load/unload: user can load or unload with one key easy to control.
Application
As the generator loading system
Periodic running test for standby generator
UPS inspection and maintenance
Ship battery charging/discharging system testing
The acceptance of new system and testing of servicing equipment