Add to Cart
In Russian Market 1000KVA Inductive Load Bank for Diesel Generator Testing
Product description
1.AC Load Bank offers the most robust, high-capacity designs in the industry.
2.It is setting the standard with intelligent operator controls, safety indication layouts, adjustable load step resolution, and lightweight designs.
3.AC Load Bank is the perfect solution for regularly scheduled maintenance testing and commissioning of mission-critical standby emergency power systems.
Technical Parameter
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Voltage range | 400v 50hz ±10% |
Max Rated power |
Apparent Power: 1000kVA |
Load Resolution |
Resistive load:1.2.2.5.10.10.20.50.100.200.200.200kw |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | AC380VAC/50Hz,3 phase 4 wire |
Wire Connection |
Load power supply input——Copper bar (star coupling) |
Communication Interface | RS485, |
Casing Dimensions and Cooling | about 4000*2350*2591mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling |
Weight | About 3600kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
High Efficiency Data Management: display real-time testing data, generate curves graphs automatically, also can put data into storage. According to generator set No. set up testing file, support to query at any time, and improve data management efficiency.
Application
1.Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units
2.generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance.
3.During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.