Add to Cart
3 Phase AC Variable Resistive 400v 1500kw Resistive Load Bank For Generator Testing
Product Description
1. load bank can accurately test the output power and load capacity of various generator sets
2.the system consists of two parts of measurement and loading, including AC load bank, data acquisition system, automatic load and drop control system, cooling device, auxiliary control,PC software,and so on.
3.The user can freely select local control or software control to operate the load bank.
Technical Parameters
Rating Voltage/Frequency | 400VAC 50Hz/60Hz,3phase 4 wire |
Max Load Power | Resistive Load: 1500kW |
Load Step |
Resistive Load:16 steps |
Power Factor | 1 |
Load Tolerance(each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power Supply | External 415VAC, 3phase 4wire 50Hz |
Wire Connection |
Load Power Supply Input——Copper bar (star connection) |
Communication Interface | RS232 and RS485 |
Insulation Class | F |
Duty Cycle | Continuous |
Cooling | Forced air cooling, horizontal air inlet and air outlet |
Transportation | Hoisting, there are lifting lug in top of case and wheel castors on the bottom |
Chassis color | Gray(RAL7035) |
Size |
Approximately 1900mm*2900mm*2100mm |
Weight | Approximately 2000kg |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤2500meters |
Atmospheric Pressure | 86~106kPa |
Product Advantage
Kaixiang company is in leading position in generator set testing and maintenance industry, besides general functions, its load bank has following unique advantages:
1. Standard Testing Function: The load bank can do stable test, transient test, and realize functions, such as setting, fluctuation, instant load, and instant unload.
Application
Manufacturers of standby power generators commonly use load banks to test and tune newly assembled units. When the generator has been set up in a test cell within the factory, a test engineer uses the load bank to apply a discrete, selectable electrical load to the generator and measure the response stability and endurance. During this process, the test engineer calibrates and adjusts the generator performance to ensure it meets the intended product specifications and tolerances.